“ MIZIMA LIMITED ” Electrical & Plumbing

Z

( A) Historical Background of Mizima Limited

Starting from 1989, we had conducted Electrical works in Myanmar were performed by our Electrical private team for assorted kind of electrical work such as Shop-house, Residences, Garment factory, Fashion shop, Food court and Office room up to 1994.

From 1995 to 1996 we had successfully proceed to private housing ( Residential Building ) Electrical and Plumbing installation as house Wiring and small plumbing sanitary work respectively. In 1996, we continued M&E installation works in collaboration with Local famous Companies for more than 50 Projects including with Myaing Hay Wun Condominium ( 14 Storey ) project at junction 8 , Myanmar Sampoerna Tobacco Factory Project, Ayyar Hotel Renovation Project, Asia Royal Clinic Project, T.I Garment Factory Project and Myanmar May Flower Bank Project from 1997 to 2005.

Mizima Limited had registered and incorporated under the Myanmar company act on 2000~01. In 2006 and registered under DICA in 2012~2013, we continued our Electrical works successfully forming Mizima Limited as a famous in Electrical company up to present.

Our main businesses include supply and install of the Low Voltage System and Extra Low Voltage System. On conditions, we had also performed Plumbing and Sanitation, Small Construction work successfully altogether. We had conducted our Electrical installation works in association with many companies.

 

Z

( B) Our Associated and Collaborated Companies

  1. Yangon International Air-port Project in 1987-1988 with Yamatow Electric Co., Ltd. ( JV – TAISEI CORPORATION )
  2. Staff of JPN company for Embassy of Japanese ( EOJ ) Project in 1994 with Taikisha Ltd. ( JV – KAJIMA CORPORATION )
  3. MEDEC M&E Singapore ( for Ruby Hall ( MICC-1 ) project ) with Shwe Taung Developemnt.
  4. Olympic Company Ltd. ( over fifteen year ago associated )
  5. Shwe Taung Development International Co., Ltd. ( over 50 projects )
  6. Green River Construction Co., Ltd. ( over 10 projects )
  7. Myo&Myint Brothers Co., Ltd.
  8. Constructive Engineering Company (” Carrier “,Myanmar )(for BMS and A/C power supply )
  9. Htoo Trading Co., Ltd. ( for Kandawgyi Palace Hotel Project, Yangon. )
  10. Asia World Company ( for International Airport Project, Nay Pyi Taw )
  11. Serge Pun & Associates ( SPA ) and WTI ( wood technology Industry ) for Factory and for PHGE 8 fair way Apartment and Residential BLDG#A-3,Star City ( Thanlyin )projects
  12. ELTG ( S’pore ) jv RGCCL Co., Ltd. ( for 22nd Storeyed Tower project )
  13. M&A Construction Co., Ltd. (Yatch Club ( Ngwe Saung ) and Vantage Office Tower project )
  14. Royal HaskoningDHV Ltd. ( for Tomato Greenfield Brewery ( Heineken Beer ) project )
  15. APB Alliance Co., Ltd. ( for Tomato Greenfield Brewery ( Heineken Beer ) project )
  16. IGE Group of Companies, FCGC company and Aye Chan Mon Co., Ltd.
  17. Pristine Lotus Resort Co., Ltd. ( for Ngapali Beach Hotel project )
  18. SCW Development Group Ltd. ( For Yan Shin ( Skysuites ) Condominium project )
  19. ASPIDIN Construction & Trading Co., Ltd. ( for The IVY Condominium project )
  20. Thaw and Thaw Design and Consultancy Engineering company.
  21. U Win Myint ( Integrated Engineering ), Design and Consultancy Company.
  22. U Khin Mg Oo, Design and Consultancy Company.

We had conducted successfully for the electrically Installation works of those companies in our industry for construction projects.

Z

( C ) Our Projects References

  1. Factories
  2. Offices & Office Towers
  3. Broadcastings
  4. Supermarkets and Shopping Malls
  5. Shop Houses
  6. Residential Buildings
  7. Airport
  8. Cinema & Auditorium
  9. Hotels
  10. Fuel Stations
  11. Banks
  12. Clinics & Hospitals
  13. High Rise Buildings and Condominium
  14. Convention Centre
  15. Insurance Building
  16. Multi Storeyed Car Parking
Z

( D ) Our Installation Process & Undertaking

( 1 ) Standard Installation Method Approval

  • Lighting Control system and its Installation and references
  • Bus duct system and its Installation and references
  • Flush floor trunking installation and references
  • Wall, Slab and Ceiling Piping Installation
  • Embedded Piping Installation
  • Earthing ( Grounding ) system Installation
  • Lightning system Installation
  • Race Way ( Cable routing ) System ( Cable ladder, Metal Tray & Trunking )
  • Fitting & Fixture Installation
  • Switchboard and SDB Installation

( 2 ) Schedule of Installation Program & Process

  • Master Schedule
  • Monthly Schedule
  • Weekly Schedule

( 3 ) Daily Programme as follow on site

  • Manpower report ( Daily , 8:15am )
  • Daily Activities sheets ( Daily, 8:15am, Only Last day report )
  • Attend to Daily Co-Ordination Meeting ( If necessary )
  • Material Requisition ( Daily ( i ) 8:15am & ( ii ) 13:15am ), ( To be Advise )
  • Safety Instruction and Checking ( Every Saturday, Time was to be advise )

( 4 ) Inspection Procedure

  • Delivered Material Inspection
  • Shop Drawing Inspection
  • Marking Inspection
  • Installation Inspection
  • Fitted Equipment Inspection
  • Testing Inspection

(5) Testing & Commissioning procedure

  • Earth Resistance Test
  • Insulation Test
  • Sequence Test
  • Circuit Test / Polarity Test
  • Load ( Ampere ) and Full load Test

( 6 ) Completion Schedule of Installed Equipment ( Check List )

  • Adequate space / Access / Lighting at Switchgear
  • Circuit Identification
  • Periodic Inspection Label Fitted
  • Functional RCD Test Label Fitted
  • Warning Labels Fitted ( i.e, 400V alive )
  • Protective devices Correctly Rated for Overload Protection
  • Protective devices Correctly Rated for Assessed Ip
  • Cable Correctly Sized for Install Conditions
  • Neutral Order same as Fuses / MCB’s
  • Protective Conductors and Connections Adequate
  • Exposed Conductive Parts Adequately Earthed
  • Main Bonding Sized to Current Regulations
  • Conductors Correctly Identified at Terminations
  • Lamp Holders and Cable Ends Correct Temperature Rating
  • Protective Conductors Sleeved
  • Cables Below Floors and Above Ceilings Correctly Installed
  • Live parts Insulated and Further Protected
  • RCD/ELCB Protected sockets for Equipment Outside
  • Making Good ( Eg. Fire Barriers )
Z

( E ) Guarantee / Warranty and Participation for Training

During the project operation, we will conduct joint performance and supply with the project team from Client Engineering and Maintenance and Training will be made for the
workplace knowledge requirements. After the completion of the assigned operations, we will

submit redraw As-Built Drawings together with the Test Result Records with occurred any changes and location transformers of the Approved Shop Drawings describing the actual work done. We
will offer all the actual electrical drawing design with the Original and the two copies of drawings together with one electronic CD.

Z

( F ) Our Company Policy& Benefits

  1. In time completion of the works according with Quality and Standards.
  2. Disciplines obeying, Interest in work performance and energetic effort.
  3. Creative work performance for the better improvement of quality.
  4. Performing work in safety.
  5. Credibility & Trust building.

Monthly rewards will be offered to those who have the above mentioned work performance. The following rewards and supports will be made.

  1. Bonus offerings twice a year in October and April ( before Water Festival )
  2. Medical check-up will be made once a year for the permanent staff.
  3. Internal service training twice a year.
  4. Workplace safety training quarterly
  5. Social and health support to staff for one year and above permanent staffs.
  6. Celebration of the staff party yearly for all the staffs.
Z

( G ) Our Ambition for All Client

  1. To have successful completion of all the project works of the Client Company in time.
  2. To have overall standardization of the assigned tasked.
  3. To have decreases in losses and wastages.
  4. To have no extra costs and delay.
  5. To have full obey of the disciplines of the Client Company.
  6. For the safety of H.S.E and environmental damage protection.
  7. We will take the total accountability of all the tasks to have the successful completion and full satisfaction of the Client Company.

We intend to conduct the Project of Client Company with our experiences and advanced technology to offer the best services according with the international standards together with our international standard of Myanmar Engineers in alignment with the attached “Logic Diagram for Electrical Installation process ”from the beginning of the works to the total completion of all the assigned tasks.
For the proper implementation of all the above scheduled tasks, we will conduct according to the

Instruction offered by the Client Company/Consultants and Design requirements. Similarly, we will perform joint consultation with the Construction Work and Mechanical works

( A/C &plumbing ) teams with Daily/Weekly Co-ordination meetings. For the every step of the work, close supervision of the Site Engineers will be made taking full responsibilities. We do hope that all the tasks will be successfully and fully operated to have full Satisfaction of the Client Company.

“ Thank You ”

Contact Us

No.E2/B Hanthar Yeikmon Duplex Building , MingalarThukha Street, (5) Quarter , Kamayut Township , Yangon , Myanmar.

01502343,01 505617 , +959 5017009 , +959 785017009 , +959 975017009

95 1 502343

www.mizimalimited.com